Plan the work
Set the boundary
- Identify legal limits, work limits, easements, structures, and the place where runoff is intended to go.
- Use current survey information where line or elevation accuracy matters.
Sequence the work
- Coordinate clearing, demolition, rough grading, drainage, base placement, utility work, stabilization, and final grade in a workable order.
Control disturbance
- Check permit thresholds, temporary erosion/sediment measures, entrances, stockpiles, and protection for inlets and adjacent parcels with the relevant authority.